-Step 1: Securing the rig: Utilize a drill screw to firmly secure the rig onto a flat surface. This ensures the rig remains stationary during the operation.
-Step 2: Mounting Rotation Axis 2: Use a hexagonal screw to attach rotation axis 2 onto the pre-existing pass on the rig. This creates synchronization between the two rotating axes.
-Step 3: Connecting with the product: Utilize a coupling joint to link rotation axis 2 with the product or component requiring rotation. This enables the product to rotate along the designated axis.
-Step 4: Programming the two rotating axes: Develop individual programs for each rotating axis. These programs will control the rotation of each axis independently.
-Step 5: Connecting via trigger: Utilize a trigger mechanism to link the programs of the two rotating axes. This guarantees simultaneous and synchronized operation.
-Step 6: Running the program: Activate the trigger to execute the program that connects and synchronizes the two rotating axes. This action will rotate the product according to the pre-programmed specifications.
Each step is crucial to ensure precise and efficient execution throughout the operation.